The hydraulic rig arrives on a low-loader, its Kelly bar glinting under Devon's changeable sky. In Exeter, where a medieval street pattern overlays Roman and Saxon layers, deep excavation design starts not with software, but with the drill bit's resistance against Permian breccia. The city sits on a geological hinge: Heavitree Breccia to the west, Dawlish Sandstone to the east, and the Exe's alluvial clays threading through the centre. BS 5930 site investigation guides the borehole programme, feeding parameters into Eurocode 7 (BS EN 1997-1:2004) design scenarios. Every retained cut beneath Exeter's conservation areas demands a support strategy calibrated to weak rock, groundwater perched within the sandstone, and the proximity of listed structures. We complement the ground model with CPT testing where the soft clays of the floodplain need continuous profiling before shoring design begins.
Exeter's geology doesn't forgive generic shoring: Heavitree Breccia weathers fast, and the Exe's alluvium creeps under modest surcharge.
Scope of work in Exeter

Critical ground factors in Exeter
A common mistake on Exeter jobs is treating the Dawlish Sandstone as a homogeneous weak rock and skipping face mapping. The formation contains silty interbeds and open joints that channel groundwater; a designer who assumes isotropic conditions will undersize the dewatering system and face reinforcement. The result—progressive ravelling at the face, settlement behind the wall, and a Section 61 notice from the council for damage to adjacent infrastructure. Another error is ignoring the long-term pore pressure equalisation in the Exe Valley clays. Temporary works designed solely on undrained strength can stand safely for weeks, then displace suddenly as positive pore pressures migrate toward the cut. The design must consider both short-term and long-term drained conditions, with piezometer data feeding back into staged excavation sequences.
Our services
Deep excavation design in Exeter requires a tight coupling between site data and numerical modelling. The services below form a continuous chain from ground truth to construction-ready drawings.
Temporary Works Design and CAT III Checking
Full design of embedded retaining walls, props, walers, and corner braces for basements, shafts, and cut-and-cover tunnels across Exeter. We produce calculation packages checked to BS EN 1997 Design Approach 1, with CAT III independent verification when the excavation falls under Network Rail or Environment Agency jurisdiction.
Excavation Impact Assessment and Settlement Analysis
Coupled hydro-mechanical FEM modelling to predict ground movements and assess risk to adjacent buildings, utilities, and the Exeter Canal. The analysis outputs settlement contours and angular distortion values checked against CIRIA C760 damage classification, supporting party wall agreements and planning conditions.
Common questions
How long does a deep excavation design package take for a typical Exeter basement project?
For a single-storey basement in Exeter, from receiving a compliant ground investigation report to issuing construction-ready drawings, allow four to six weeks. The programme extends if the design requires input from the Environment Agency, such as when dewatering affects the Exe's floodplain or the Exeter Ship Canal corridor.
What is the cost range for geotechnical design of a deep excavation in Exeter?
Design fees typically fall between £1,460 and £6,500, depending on the excavation depth, the number of retained faces requiring independent analysis, and whether CAT III checking is required. A straightforward propped contiguous pile wall for a residential basement sits at the lower end; a complex infrastructure shaft with multiple strut levels and staged dewatering moves toward the upper end.
Do you handle the temporary works design and the permanent works design together?
Yes, the temporary and permanent cases are evaluated within the same Eurocode 7 design model. This avoids conflicts where a shoring system adequate for construction loads proves incompatible with the long-term basement wall performance, particularly regarding watertightness and durability in Exeter's aggressive sandstone groundwater.